Engineering consulting · runs in your browser

Dust collection design
from one data sheet.

Enter the flow, temperature and dust duty and the system proposes the best treatment, then completes detailed sizing, P&ID, estimates and safety screening for the train you choose.

ISO 3·ISO/IEC 80079-20-2·IEC 60079-10-2·AMCA 99·IFC EHS
Auto-generated process flowP&ID PREVIEW
HoodcaptureCyclonecoarseBaghousefineFandraftStackdischargeDusty gas →→ Clean exhaust
99.9%
PM efficiency
≤10 mg
Target outlet
computed
5-yr TCO
38
dust property records
8-stage
design engine
IFC · WHO
emission references
5-year
TCO simulation

A design office, on one screen

From concepts to detailed design, drawings, estimates and safety screening — the whole engineering workflow, automated.

Data sheet consulting

Enter the basic duty and the system reviews the key values and proposes the best options.

Compared concepts

Dry, wet and semi-dry trains compared with diagrams, trade-offs and TCO.

Dynamic detailed design

Only the stages your train needs (3–8), sized precisely.

Established engineering methods

Swamee-Jain, Lapple, Deutsch and Verhoff-Banchero computed together.

Flow chart · BOM · 5-year TCO

Flowsheets, bill of materials, cost of ownership, slides and PDF reports — generated.

Safety screening

Combustible dust St classification and Zone 20/21/22 mapping (IEC 60079-10-2).

Five-step consulting flow

Not a fixed wizard — it follows the train you actually build.

01
Data sheet
Flow, temperature, dust and target emission
02
System review
Missing and auto-filled values confirmed
03
Concepts
2–3 options with diagrams, trade-offs, cost
04
Q&A convergence
Your questions, closing questions, one final option
05
Detailed design
Per-equipment sizing, drawings, reports